Saturday, October 31, 2009

More Power!

I installed the Legacy nodes in their new rack last night and today was spent preparing the shop for the new mains leg to be installed.

Rearranging was the hard part. It turns out running the new cord under the house is going to be easy. While I had been planning to tie a string to a rock and skip it under the house to the other side, I found I already have a string in place in the form of the very extension cord supplying the shop right now. I connect a lesser cord to that and pull it under the house to use for pulling both supply cords back for semi-permanent installation.

No comments: