The spider problem has been gone for months now. That's no big deal. What is, however, is the fact that Fragwell Labs, while once intended to receive a makeover, is going to be a barn for my server farm during the cold months.
With that in mind, I need more power. While the lab already has a 20A circuit, it has suffered some regrettable limitations due to the way I set the wiring up. When we moved in, the lab was wired with power via a 20A drop from the breaker panel to a piece of Romex and then to a junction box with a GFCI inside. From there, a grounded 12AWG extension cord was plugged into the box, run under the house and out to the lab. That was fine, for a bit, until I was heating the lab with a bunch of idling computers last winter to try to keep it at a temperature where I could work comfortably and ended up blowing the "15A" breaker on my ten year old power strip. This tripped the GFCI so I had to pull the skirting and push the reset button. Not easy with a foot of snow in my way. I have better power strips now, but there's another problem.
Directly inside the shop, the extension cord has a three-way splitter plugged into it. This splitter has a 13A breaker on it and it's very touchy, especially when the ambient temperature is high as is common during Utah summers. Running my lab computer, lighting, portable A/C unit and laser printer is a recipe for a breaker trip. Not fair.
But there's a way around it. This weekend, I run a second 115VAC line off the other side of the phase. While I can't go directly from a single outlet to a power strip and use all 20A since code is such that no single outlet can use more than 80% of the ampacity of a circuit, I can get a tw0-way splitter and use the full ampacity of both lines. While that circuit won't be enough during the summer months where cooling is a necessity, it will be more than enough for winter, even with the server farm and laser printer, assuming I use the printer all that much.
The compute cluster is meant to be powered by a 230VAC 15A circuit when fully loaded. With the 80% rule in effect, that's 12A peak they plan for. I still have 8A left on each rail, which would be enough for the AC unit and my laser printer to coexist.
I have nine compute nodes. Eight work. The cluster power rating looks at ten nodes.